Medium-voltage transformers delivered in 12 to 16 weeks.

Pad-mount and unit substation transformers, 500 kVA to 12 MVA, 15 kV and 35 kV class. Built for data centers, utilities, solar and storage, and Permian operations.

Three-phase pad-mount transformer with dead-front cabinet and radiator fins
  • IEEE C57.12.00 and C57.12.90 testedCertified routine test reports ship with every unit.
  • DOE 10 CFR 431 compliantEfficiency levels met on every covered rating.
  • FM Approved FR3 natural esterFM 3990 less-flammable construction for indoor and insured sites.
  • ISO 9001 certified manufacturingDocumented quality system from core to final test.
  • North American manufacturingUSMCA-qualified. No ocean freight in the schedule.
  • Texas-based engineering and deliveryDallas and Midland. DDP to the site.

Who we build for

One factory schedule, four kinds of project. The specification differs by segment; the lead time does not.

AI data centers

FR3-filled unit substations 2.5 to 12 MVA, 13.8 and 34.5 kV primaries, one BIL class above standard for vacuum-breaker switching. Multi-unit delivery schedules for 50 to 100 units per campus.

Utilities and cooperatives

C57.12.34 three-phase pad-mounts 75 to 5,000 kVA with guaranteed losses, dead-front loop-feed cabinets, and DOE-compliant cores. 10 to 60 MVA substation units with LTC.

Solar and storage

34.5 kV inverter step-ups 2.5 to 5 MVA with dual low-voltage windings, electrostatic shields, and bidirectional BESS duty rated for continuous cycling.

Permian operations

Pad-mounts rated for 50 C ambient, ESP multitap step-ups, skid-mounted unit substations for rigs and compression, with support out of Midland.

How an order runs

What procurement needs to know before the first call, in the order they usually ask.

  • Drawing approvalSubmittal package within 10 business days of order: outline drawings, nameplate data, test plan, inspection and test plan.
  • Lead time12 to 16 weeks on standard three-phase pad-mounts and unit substations. Production slots confirmed at order.
  • TestingRoutine tests per IEEE C57.12.90 on every unit, with certified reports. Witnessed factory acceptance tests on request.
  • DeliveryDDP to Texas and Southwest sites. Staged deliveries for multi-unit campuses.
  • Terms20 percent deposit with milestone payments at drawing approval and shipment. 18-month warranty from shipment.
  • SupportEngineering and commissioning support from Dallas and Midland. Spare parts and field service in Texas.

Send the specification and the need-by date.